Marina basin operational · apartments fitting out
The marina basin has been dredged and the first berths are operational. The marina apartments are in final fit-out, and the western beach extension is being graded and sanded.
A 500-acre stretch of Mediterranean coast — beaches, lagoons, a marina, and luxury beach villas, all set to the unhurried cadence of the sea and the signature ORA approach to coastal living.
Silversands is ORA's vision of what a North Coast resort can be. Rather than a row of compounds, it is a single coastal destination — 1.2km of private beach, a swimmable lagoon system, a working marina, and beach villas that open straight onto the sand.
The typologies — beachfront villas, lagoon chalets, and marina apartments — are set among palm-shaded promenades and dune gardens, with cars kept to the edge so the shoreline belongs to walkers, swimmers, and the sea breeze.
The resort opened in summer 2022. The beachfront and the first lagoon are fully operational, and the Marina release — the final villas and the marina apartments — is the focus of this season's launches.
Silversands sits on a prime stretch of the Mediterranean, a short drive from Sidi Abdel Rahman and the new North Coast coastal road, putting it at the centre of Egypt's most sought-after summer coastline.
1.2km of soft white private beach — the swimmable, sun-drenched heart of the resort.
A continuous beachfront promenade running the length of the resort — palm-shaded, walkable, social.
A working marina with berths for day boats and yachts, framed by waterfront dining and a beach club.
A system of swimmable turquoise lagoons reaching inland, so every villa is minutes from water.
A signature beach club with pools, cabanas, and a sunset bar overlooking the Mediterranean.
Sun-washed white facades and sandy stone — relaxed, breezy, made for long coastal summers.
The Silversands master plan is organized along the coast — a continuous beachfront promenade with the swimmable lagoon system reaching inland behind it, and the marina anchoring the western headland. Villa clusters step down toward the sand.
The plan was developed in collaboration with Foster + Partners, with landscape design by SWA Group. It is fully operational as a resort, with the final marina release now opening for sale.
Silversands has been delivered in three phases. Phase 1 opened in 2022; Phase 2 is delivered and lived-in each summer; the Marina release has just opened for sale.
The first beachfront villas and dune villas, the beach club, and the opening 800m of private beach. 420 chalets and villas delivered.
The crystal lagoon system, the lagoon chalets, and the full beach promenade with its first waterfront restaurants. 460 units delivered.
The working marina, the marina apartments, palm townhouses, and the western beach extension. 320 units open for registration.
A running record of progress across Silversands — updated each quarter with site photography and completion milestones as the resort matures.
The marina basin has been dredged and the first berths are operational. The marina apartments are in final fit-out, and the western beach extension is being graded and sanded.
The crystal lagoon system and the full beach promenade ran a complete summer season. The first waterfront restaurants traded through peak, and lagoon chalet handovers are complete.
All 420 Phase 1 chalets and villas are handed over and occupied each summer. The beach club, pools, and the opening 800m of private beach are open and operating at capacity.
Silversands welcomes thousands of homeowners and their guests each summer. What follows is what they actually do here — every day by the sea.
"We've tried every coast in Egypt. Silversands is the first place where the beach actually felt like ours — and the kids never want to leave."
"The marina makes the evenings. We walk down, the boats come in, dinner on the water. Summer just slows right down."
"My kids swim in the lagoon all morning and the beach club all afternoon. That's the headline. Everything else is a bonus."